Brand logo
HomeSemiconductorsEmbedded SystemsPCB DesignPower DevicesEDA ToolsGeneral
  1. Home
  2. /
  3. general
  4. /
  5. and-gate-replaces-comparator-frequency-divider-chip-count

Two Chips Instead of Four: A Build Guide for AND-Gate Decoded Even-Ratio Frequency Dividers

Short answer: a ripple-carry counter does not need a magnitude comparator to tell the designer when the count is finished. Because the tally ripples, one AND gate can recognize the terminal state, and the decoder collapses from a dedicated IC into a single gate. Schemes that would otherwise take three chips for division by 10, or four chips for division by 48, reduce to a two-chip build, and the last divide-by-two flip-flop still hands you a symmetrical 50% duty cycle.

Everything below grows out of Jayapal Ramalingam's Design Idea, published under the title “Frequency division by any even number, with a 50% duty cycle output,” and catalogued in the Design Ideas Submission Guide. Two examples in that material share one skeleton: a ripple-carry counter, a comparator that fires the reset as soon as the tally reaches half of the chosen ratio, and a final divide-by-two square-wave output flip-flop. The circuits are functionally sound. What follows keeps the behaviour, drops the comparator, and then adds the bench-level detail the schematic itself cannot convey: ratio arithmetic, honest speed ceilings, input-termination rules, and the mistakes that surface first in the lab.

Why can one AND gate replace the comparator?

Because the state you are hunting is announced by a single bit flipping into place. As a clock pulse increments such a counter, zeros move through the stages until one zero bit is flipped to a one. Detecting the chosen terminal count therefore degenerates into an AND of the weighted taps that go high together — no magnitude comparison, no borrow chain, no multi-level gate tree. That is the inherited property the original design leans on without naming it.

Silicon measurements support the same reasoning from the other direction. In an N/M-ratio all-digital clock generator reported by J. Kim (Electronics, MDPI, 2022), the maximum divider speed is bounded by three delays sitting in series: the count-detector delay, the counter's propagation delay, and the reset-logic delay (source paper). Replacing a comparator with one AND tier shortens precisely the first term, so the parts saving and the timing saving come from the same edit.

How is division by 10 built from just two chips?

Figure 1 shows the compact answer to the frequency-division problem.

In the divide-by-10 circuit, U1a is a Four-bit ripple counter and U2a supplies a 4-input AND gate. The gate reads that counter and produces a divide by 1 + 4 = 5; U2b's division by 2 then cascades behind it, giving Fout = (Fin/5)/2 = Fin/10, a 50:50 square wave. Where the comparator-based version of the same task needed three chips, this two-chip solution closes the job.

What ratio set does the same chip pair unlock?

  • First stage, weight-sum decode: the modulus equals the sum of the U1a output weights wired into U2, so ratios from 1 through 15 are available; the example above uses 1 + 4 = 5.
  • Reset action: once U1a ripples up to the chosen number, U2a pin 6 becomes a logic “1”, which clears U1a back to zero and advances U1b by one count.
  • Second stage: U1b contributes a power-of-2 division, selectable among 4 possible ratios: 2, 4, 8, or 16, so the worked example nets out as 5 x 2 = 10.
  • Envelope: the combinatorics allow 15 x 4 = 60 ratios in principle, drawn from sequences such as 2, 4, 6, … 30; 4, 8, 12, … 60; 8, 16, 48, … 120; and 16, … 240.

Do 48 and 100 also fit inside two chips?

Yes. The same concept yields a division ratio of 48 with just two chips (Figure 2), and division by 100 with a 50:50 output on the identical part count (Figure 3).

In the divide-by-48 case U2a decodes U1a into 4+8=12, and U1b's division by four follows, so Fout = (Fin/12)/4 = Fin/48.

In the divide-by-100 case U1a divides by 16 first; U2a then decodes 1+8=9, which lifts the first stage to 16+9 = 25; U1b's division by four delivers Fout = (Fin/25)/4 = Fin/100.

BuildFirst-stage decodeSecond stageNet ratioIC count
divide-by-101 + 4 = 5division by 25 x 2 = 102 (vs three chips with a comparator)
divide-by-484+8=12division by four12 × 4 = 482 (vs four chips with a comparator)
divide-by-10016+9 = 25, with 1+8=9division by four25 × 4 = 1002

How do you size your own ratio, step by step?

  1. Write the target modulus N and confirm it is even; the trailing divide-by-two stage is what buys symmetry, and it consumes a factor of 2.
  2. Peel off a power-of-2 partner from the range 2, 4, 8, or 16 so that N = M × 2^k. For N = 10 that is 5 × 2; for 48 it is 12 × 4; for 100 it is 25 × 4.
  3. Check whether M sits inside 1 through 15. If it does, wire the binary weights that sum to M into the 4-input gate: 12 needs 4+8=12, 5 needs 1 + 4 = 5, 9 needs 1+8=9.
  4. If M exceeds 15, let a preceding ripple stage contribute a fixed weight and decode only the remainder — the ÷100 build does exactly this, 16+9 = 25.
  5. Drive the counter clear from the decode output (U2a pin 6 in the reference schematic) and place the divide-by-two flip-flop last, on the tap that toggles once per first-stage cycle.
  6. Tie U2's unused inputs to V+ or ground before power-up, then verify the waveform at both ends of the supply range you intend to run.

How fast can a discrete version realistically run?

Expect tens of megahertz, not hundreds. Three independent limits stack up:

  • Family ceiling. Texas Instruments rates the CD4017B ripple-counter family for medium-speed operation at roughly 10 MHz typical with VDD = 10 V, on a 3.0 V to 15 V supply, with fully static operation (CD4017B product page). A 5 V rail moves that figure down by several megahertz.
  • Rippling delay. An asynchronous counter cannot be clocked any faster than its largest accumulated propagation delay across every stage, a standard limitation of ripple architectures (reference text). Longer moduli mean more stages, so ÷48 and ÷100 reach the wall before ÷10 does.
  • Edge tolerance is not speed. The Schmitt-trigger action on these counters' clock input accepts very slow rise and fall times, which helps noisy sensor lines — but it buys nothing on the decode-and-reset path that sets the real limit.

Read against silicon, the trade becomes obvious. Reported IC-level work on charge-steering dividers describes a 65 nm CMOS divide-by-4 block taking a 16 GHz input while drawing only 0.280 mW from a 1.2 V supply, with phase noise quoted at −141 dBc/Hz; a separately reported 0.18 µm quadrature divider for TV tuners covers 50–860 MHz and measured 1.14 degrees of phase error at a 750 MHz output. Those numbers belong to a different universe from a two-chip board-level build — and measurement reported in the tuner study also indicates roughly 6 dB of phase-noise improvement for each divide-by-2 step, which is a useful reminder that the trailing divide-by-two flip-flop in the discrete design is doing more than fixing the duty cycle.

Which mistakes wreck these builds first?

  • Leaving spare gate inputs dangling. The rule from the source design — tie U2's unused inputs to V+ or ground — is not a style preference. Floating CMOS inputs can sit inside the switching threshold, letting both halves of the input inverter conduct; vendors document supply-current surges of a few milliamps per input, oscillation, and, in the worst case, device damage, and TI's guidance on slow or floating CMOS inputs (literature number SCBA004) is echoed in application notes across the logic families. Toshiba's CMOS usage guidance likewise requires every unused input to be held at VCC or GND (e-learning module).
  • Treating the reset pulse as guaranteed. The decode is combinational, so the clear window is a race between gate delay and the next clock edge; run past the family ceiling and you get skipped counts rather than clean division.
  • Wiring the wrong weights. The modulus is a sum of the selected output weights, not a binary-coded word; if you want 12, connect the 4 and 8 taps.
  • Omitting the last flip-flop. Ripple and AND decode alone give you the correct count but no symmetry; the 50% duty cycle is manufactured by the final divide-by-two stage.
  • Sampling ripple outputs downstream. Intermediate states exist for one stage delay each, so feeding a ripple tap combinationally into other logic invites glitches.
  • Trying an odd modulus directly. The published family addresses division by any even number; odd ratios have no clean way through the symmetrical output stage, and forcing one is a redesign, not a patch.

Where does this topology earn its place — and where does it not?

Good fit: lab timing wheels, slow serial-clock derivation, stepper and LED animation clocks, instrument-division of a crystal-derived tick, teachware where you want to probe every node, and any one-off where two logic ICs already sit in the drawer. Poor fit: anything RF-side of tens of megahertz, multi-standard synthesizers, and designs where jitter rather than division accuracy dominates — there, a monolithic prescaler or PLL is the honest answer, not a smaller schematic.

FAQ

Does the AND gate change the division result versus a comparator?

No. Both produce the same terminal-count event; the AND version simply relies on the rippling property, which makes the reset point visible in one gate tier instead of a comparison chain. Part count falls, behaviour holds.

Why is the output a clean square wave?

Because every configuration ends in the same divide-by-two flip-flop, which divides an already-asymmetrical pulse train into a 50:50 waveform. The ÷10 build shows the arithmetic explicitly: Fout = (Fin/5)/2.

Can I cascade more stages for larger ratios?

Yes, at the cost of speed and edge alignment — the ratio arithmetic extends (each added power-of-2 stage doubles the available envelope), but accumulated ripple delay shrinks the usable clock range. Treat this as an analytical extrapolation rather than a published specification.

Would a PLD make this obsolete?

In gate terms, a small programmable device absorbs the whole divider, so the parts-count argument disappears. The transferable lesson survives regardless: shorten the detector path first, because it is the element that sets the divider's speed ceiling alongside counter and reset delays.

Reference sources

  • Jayapal Ramalingam — Design Idea “Frequency division by any even number, with a 50% duty cycle output,” carried in the Design Ideas Submission Guide (schematics reproduced as Figures 1–3 above).
  • J. Kim, “An N/M-Ratio All-Digital Clock Generator with a Pseudo …,” Electronics (MDPI), 2022 — divider speed budget of count detector, counter propagation and reset logic: https://www.mdpi.com/2079-9292/11/2/261
  • Texas Instruments CD4017B product data — medium-speed operation, 10 MHz typical at VDD = 10 V, 3.0 V to 15 V supply: https://www.ti.com/product/CD4017B
  • Toshiba e-learning, CMOS logic usage considerations — handling of unused inputs: https://toshiba-semicon-storage.com/cn/semiconductor/knowledge/e-learning/cmos-logic-usage-considerations/usage-1.html
  • Circuit Bread, “Asynchronous Counters” textbook chapter — accumulated propagation delay as the ripple-counter speed bound: https://www.circuitbread.com/textbooks/lessons-in-electric-circuits-volume-iv-digital/sequential-circuits/asynchronous-counters
  • IC-level comparison points drawn from published divider literature surfaced during research: charge-steering divider in 65 nm CMOS (16 GHz input, 0.280 mW at 1.2 V, −141 dBc/Hz) and a 0.18 µm quadrature divider for digital-TV tuners (50–860 MHz, 1.14 degrees phase error at 750 MHz, about 6 dB phase-noise improvement per divide-by-2).

The practical takeaway for anyone at a bench: count the gates that actually sit in the reset path before you count the gates that sit in your assumptions. One AND tier, correctly decoded, replaces a comparator, halves the IC count, and leaves the square wave exactly as symmetric as the more expensive version. For build questions or schematic review requests, write to the Electronicseng editorial desk at info@electronicseng.com.

Reviewed and edited by Rachel Williams, Electronics & Engineering.

Brand logo

Grand Metropolitan Hotel

Industry Media for Semiconductors & Electronic Engineering

SemiconductorsEmbedded SystemsPCB DesignPower DevicesEDA ToolsGeneralAPAC TechDigit

© 2026 Electronics & Engineering.

Cookie Notice

We use cookies to improve your experience and analyze website traffic. Read our Privacy Policy to learn more.