Fig. 1 — Two LED panels turning inside a globe: the depth you perceive is generated by motion, not by optics.
If you need a real 3D image in air without glasses or a projector, the answer is a swept volume, and Vortex is its most approachable engineering version. The rotor is a pair of HUB75 modules — Two 128 × 64-pixel LED panels bolted face to opposite faces — turning on a vertical axis at several hundred revolutions per minute inside a casing shaped around a 300mm truncated spherical globe, while a Raspberry Pi 4 feeds synchronized planes that your eye integrates into a three-dimensional scene.
The first probe I put on a rig like this does not land on the panel supply rail or on any video output — it lands on the photointerrupter. AncientJames put the mechanical files and the code online via GitHub so the build can be studied and reproduced, and in my experience every reported artefact reduces to one of three questions: where the index edge arrives, how much voxel data the driver can push before that edge returns, and how honestly the rotor was balanced. Those three questions, in build order, are the rest of this guide.
Written as a spec rather than a video caption, Vortex asks for a free-standing gadget that paints a genuine 3D image, readable from any bearing, with no host PC tethered to it and no exotic optics in the light path. The paired rotor satisfies the viewing-angle requirement; the shared-memory voxel architecture plus the on-board Raspberry Pi satisfies the untethered one. Press coverage of the display runs back to February 2024, with longer construction write-ups following in November 2026, which means the design has been poked at by working engineers and not only admired on video.
It is a swept-volume, persistence-of-vision display: lit points trace actual positions in space, and nothing is reconstructed by interference or by a lens stack. That distinction changes how you debug it, because the failure modes here are timing and balance failures, never optical ones.
Strip the panels down and they are light grids. Set one spinning and the moving lit points fake the impression of three-dimensional space — the same trick a sparkler performs when a circular swing leaves a drawn ring behind. Vortex keeps two LED panels so the picture survives a walk around it, and on every half-turn the drive signal flips between high and low states, handing the software a phase reference at which to swap in the next image.
Less than the frame-rate instinct suggests. This section is arithmetic from published numbers, explicitly not a measured datasheet claim: take 300 rpm as a working point. Five revolutions per second, with one reference transition per half-turn, gives roughly ten index edges per second — a plane painted every 100 ms of wall time, so a late update is not a dropped frame but a missing slice of the volume.
The same reasoning accounts for the trade-off the project documents. Bit depth is selectable across one to three bits per channel; pushing it upward drags the refresh rate down, and once rotation outruns what the driver can sustain, voxels start being skipped and gaps or trails appear in the picture. The code carries a trial adjustment to compensate for skipped voxels, which is a mitigation, not a budget.
| Bit-depth setting | What it buys | What it costs | First symptom at the bench |
|---|---|---|---|
| 1 bit per channel | Maximum scan-out margin | Coarse shading only | Cleanest geometry, flat-looking content |
| 2 bits per channel | Usable grey levels for point clouds | Reduced refresh headroom | Occasional trailing on the far side of a fast sweep |
| 3 bits per channel | Strongest apparent depth cueing | Lowest sustained refresh | Skipped voxels and holes when the rotor sits at the top of its speed range |
Practical consequence: set rotor speed last. Prove the geometry at the lowest depth, raise the depth, and only then move the governor upward, because those two controls spend the same pool.
Every line of the published parts list is load-bearing in some way. Driving and structure come from two P1.875 HUB75 LED panels, two 6mm × 225mm carbon-fibre rods, a Raspberry Pi 4, a HUB75 interface board and a photointerrupter. Rotating hardware is 6015 and 6804 bearings, a car alternator slip ring catalogued as ASL9013 and ABH6004S, a YM2776 motor and a Mean Well LRS-100-12 supply, joined up with a drive belt, M4 fasteners and lead sinkers used as counterweights. Enclosure work is 3D-printed components plus a post-top lamp globe cut down to size.
| Subsystem | Part | Why it is specified | Substitution risk |
|---|---|---|---|
| Image plane | 2 × P1.875 HUB75, 128 × 64-pixel | Pitch and module size that clear the 300mm globe | Coarser pitch fouls the casing; different pin-out strands the interface board |
| Rotation frame | 6mm × 225mm carbon-fibre rods | Stiff and light at the same diameter | Steel rod adds unbalance mass and bearing load |
| Spindle | 6015 and 6804 bearings | Catalogue footprints 75 × 115 × 20 mm and 20 × 32 × 7 mm — a thin-section pick forced by the core | Open races need lubricant and report unbalance first |
| Rotating joint | ASL9013 / ABH6004S alternator slip ring | Automotive part passing power and panel data through the axis | Brush wear and contact noise read as flicker, never as hard failure |
| Drive | YM2776 motor with belt | Belt keeps mass off the shaft end | Direct drive shifts both balance and index timing margin |
| Power | Mean Well LRS-100-12 | Published rating 12 V at 8.5 A, roughly 100 W, 129 × 97 × 30 mm, 85–264 VAC input | A smaller brick browns the panels out mid-sweep with no warning |
| Control | Optional dial built on a Raspberry Pi Pico W with accelerometer, rotary encoder, second photointerrupter and a 1.28-inch round touch display | Speed and content handling with no PC | A motor speed controller and knob is the honest entry point |
Two catalogue figures deserve to be pinned to your drawing. The supply is a 100 W class brick, so rotor, Raspberry Pi 4 and motor all share one 8.5 A ceiling; the 6804 thin-section bearing is the tightest fit in the printed core. Budget power for the worst-case pattern instead of the average one — an all-white plane at the top bit depth exposes both panel current and slip-ring contact noise. And treat the single-board computer as a planning item, not a hobby item: the 16GB Raspberry Pi 5 price move from 120 to 385 dollars is the identical lesson in another product line.
If the optional dial is where your second budget hour goes, remember the knob is its own component-selection problem — comparing function, duty cycle, accuracy and environment before resistance value — because a control that gets turned hundreds of times a day is a wear item, not a trimmer.
The published files support several sequences; this one is ordered by which mistake is hardest to undo.
Image data lives in a shared-memory voxel buffer holding the three-dimensional scene. A display driver reads that buffer and pushes it to the LED panels in step with physical rotation, while separate programs generate and update content. The repository describes both halves as running on the same device — the Raspberry Pi embedded in the hardware and spinning with it — which is exactly why an offline simulator was written.
One licensing asymmetry is easy to miss in the excitement: code is MIT, while the separate VortexParts repository, provider of the STEP file for printable parts, sets no explicit licence for those hardware design files. Software reuse and mechanical reuse are two different clearance jobs.
Two public variants put Vortex's decisions in relief. Dan Foisy's Flicker is a spherical volumetric display made as one circular PCB with LEDs around its edge, spun at roughly 15 revolutions per second and fed video from a Raspberry Pi over HDMI — a far lighter rotor and a far wider data path, paid for by giving up the flat panel geometry and the two-sided viewing that the back-to-back pair buys. At the other extreme, a Cornell ECE5725 project group implemented a Pygame GUI on the Raspberry Pi to drive preset images into their volumetric display, which is the same de-risking instinct as the simulator: keep the mechanical layer and the presentation layer apart, so a bad image is not automatically a bad rotor.
The published material targets that board: build commands are documented for compiling the software on a Raspberry Pi 4, and that is the computer the parts list puts inside the core. Moving to another board is an analysis question about GPIO throughput to the HUB75 interface, not a supported path.
Because refresh rate falls as depth rises. Once rotation outruns what the driver can sustain, voxels get skipped and gaps or trails appear; the trial adjustment compensates for skipped voxels, but the real fix is backing off speed or depth until each plane fits its angular window.
Swept displays do work that way — Flicker is one — but Vortex uses two LED panels precisely so the image can be read from every bearing. Halving the panels halves rotor mass and rewrites the viewing geometry you designed around.
Treat it as unresolved until someone answers. Multivox is MIT-licensed code; VortexParts supplies the STEP file for printable parts without specifying a licence for those hardware files.
An unbalanced rotor and a thin index-edge margin, in that order. Balance with counterweights behind eye protection before chasing software, and scope the photointerrupter output before touching bit depth.