Brand logo
HomeSemiconductorsEmbedded SystemsPCB DesignPower DevicesEDA ToolsGeneral
  1. Home
  2. /
  3. semiconductors
  4. /
  5. apple-oled-panel-process-sputtering-ald-samsung-lg

Electronicseng Semiconductors Playbook: Apple's HMO OLED Push — Sputtering, ALD, and What Engineers Should Spec Next

Ask a display engineer what would actually move the brightness needle on the next iPhone or iPad screen, and the answer is rarely the cover glass, the driver IC or the colour stack. It is the oxide semiconductor film only tens of nanometres thick that sits beneath every pixel. That thin film is exactly where Apple is now pushing its panel partners, and where the words "sputtering" and "ALD" stop being cleanroom vocabulary and become line-balancing, capex and bill-of-materials problems for everyone downstream.

The short version: what the reports say, and what they deliberately leave open

Supply-chain reporting indicates Apple intends to introduce a new OLED manufacturing process aimed at brighter, better-looking screens for iPhone and iPad, with high mobility oxide (HMO) backplanes as the carrier technology. The two panel makers that carry Apple's OLED volume — Samsung Display and LG Display — are jointly working the next production scheme, and each of the two is developing atomic layer deposition (ALD) technology together with related sputtering processes intended for future mass-production lines. Apple's current preference, on this account, is the route built on the existing sputtering process already running in oxide fabs.

The upside claimed for the new process is pixel-level: improved light emission from individual pixels, higher overall panel brightness, and, because efficiency rises with output, better contrast and more depth in colour gradation. What remains undisclosed is equally important for anyone writing a roadmap: no mass-production date has been published, and no product has been named as the first adopter.

Step by step: where sputtering and ALD actually enter the stack

Reading the story correctly requires knowing which layer is being talked about. Treating the backplane as a sequence of steps makes the process politics obvious:

  1. Substrate preparation and gate electrode: metal films deposited by sputtering (physical vapour deposition) on glass or polyimide.
  2. Gate insulator and, in a polysilicon flow, the crystallisation detour: low-temperature polycrystalline silicon and low-temperature polycrystalline oxide both require excimer laser annealing plus ion implantation. An oxide-only flow skips those steps, which is the root of its low-power and low-cost claim.
  3. Channel layer: this is the HMO battleground. The semiconductor oxide film is grown by sputtering in the installed-base approach, or by atomic layer deposition where step coverage and thickness control matter more than throughput.
  4. Source/drain, etch-stop and passivation, then the pixel-definition layer.
  5. Emissive stack: still patterned by fine metal mask evaporation, or by photolithographic and printer-based routes that the two Korean makers are separately qualifying — not by the sputtering tool.
  6. Thin-film encapsulation: alternating inorganic and organic barriers, where ALD is the mature entry point for the inorganic layers.
  7. Touch integration, polariser, module assembly, and burn-in screening at panel level.

The practical consequence: a supplier who says "we use ALD" might mean a gate-dielectric or barrier-film upgrade, not a semiconductor channel change. Ask which step number you are being quoted on.

Backplane technologies side by side

BackplaneTypical field-effect mobilityOff-state leakageProcess burdenWhere it lands today
Amorphous siliconAbout 0.5 to 1 cm2/VsHighSimplest and cheapestCommodity LCD; pushed out of high-end displays
Conventional oxide (IGZO-class, mass produced)Below 10 cm2/VsSeveral orders of magnitude lower than polysiliconNo laser crystallisation, no implantationLarge LCD and some mid-size OLED
Low-temperature polycrystalline siliconTens of cm2/VsHigher than oxideLaser annealing plus implantation, uniformity managementSmall-size high-PPI OLED
Low-temperature polycrystalline oxide (LTPO)Hybrid: polysilicon drive transistors with oxide switchingLow, enabling 1 to 120 Hz adaptive refreshMost steps, highest costFlagship phones and watches
High mobility oxide (HMO)Industry target of 30 to 50 cm2/Vs for next-generation IT-OLED oxideRetains the low-leakage advantage of oxideReuses oxide deposition tools; the difficulty is holding mobility, large-area uniformity and long-term reliability at the same timeUnder qualification on 6th-generation small and medium OLED lines

Two numbers carry the argument. First, oxide transistors shipping in volume today sit below 10 cm2/Vs, which is why high-refresh, high-resolution OLED drives have leaned on polysilicon or LTPO. Second, the target band the industry has set for next-generation oxide — 30 to 50 cm2/Vs, roughly three to five times current oxide — is what makes a single-material oxide backplane credible as an LTPO successor. A transistor that passes more current in the same footprint means either a smaller driver transistor and a higher aperture ratio, or the same transistor running cooler with more margin for compensation circuits such as 7T1C and 8T1C pixel designs.

Deposition route decision matrix: sputtering versus ALD

CriterionSputtering (PVD)Atomic layer deposition (ALD)
Grow rateTypically 10 to 100 nm per minute for PVD, versus roughly 0.5 nm per minute for ALD, as cited in thin-film encapsulation patent literatureAtomic-scale, self-limiting cycles; throughput is the binding constraint
Film characterFast, dense enough for channel films; large-area uniformity is the known weak point on bigger substratesConformal and effectively pinhole-free, which is why it is the reference choice for ultra-high barrier films
Line impactCompatible with existing oxide process and installed tools — the main reason Apple is examining this route firstNew chambers, new precursor logistics, thermal-budget review
Best early useVolume semiconductor channel layers, gate and source-drain metalsEncapsulation barriers, where OLED needs water-vapour transmission rates near 1x10-6 g/m2/day, orders of magnitude tighter than LCD
Cost driverYield and Mura-related reworkCost of ownership per substrate, because deposition is slow

The engineering reading is not "ALD beats sputtering" but a split assignment: sputtering carries the volume channel film, because Apple and the two suppliers cannot re-plumb whole arrays overnight; ALD earns its place where its unique strengths are non-negotiable — barrier layers and interfaces. Expect both to appear in the same quotation, which is precisely why the two panel makers are running the two routes in parallel rather than betting on one.

Capacity and timing: the numbers you can quote

  • Samsung Display's 8.6-generation IT OLED line (A6, Asan) is confirmed in production for 2026, with reported yield above 85 per cent before start-up against an industry maturity benchmark near 90 per cent, and a design capacity of 15,000 substrates per month of which about half was running early.
  • That line's first products are 14-inch and 16-inch MacBook Pro OLED panels, with roughly 2 million units of supply estimated for the current year, according to ramp reporting.
  • On phones, data from market researcher UBI Research, as carried by Sina Finance, projects Samsung Display delivering around 46 million OLED panels for the iPhone 18 series this year — the volume base any new backplane has to qualify against.
  • LG Display is developing HMO on its 6th-generation small and medium OLED line, with reliability, uniformity, mobility and yield validation still under way as of mid-2026, and has separately been reported by Sigmaintell as targeting 2029 for mask-free, photolithographic OLED production.
  • Industry chatter collected by trade outlets suggests the familiar pattern for a new backplane: a wearable-class panel first, then handsets, with both suppliers qualifying in parallel; some forecasts point to 2027 for a first HMO-based wearable. None of this is confirmed by Apple, Samsung Display or LG Display, and no report promises which product adopts the process first.

Design and sourcing checklist before you write HMO into a specification

  • Ask the panel maker to name the layer, not the brand: which film is sputtered, which is grown by ALD, and which tool in the array is affected.
  • Request transfer-length-model or Hall data for channel mobility, plus the statistical spread across a full substrate, not a centre-die sample.
  • Demand bias-temperature and negative-bias stress reports on threshold-voltage shift: oxide channels live or die by stability, and 30 to 50 cm2/Vs means little if the threshold drifts.
  • Get uniformity maps correlated to Mura and to deMura compensation headroom, because large-area thickness control is the stated weak point of the sputtered route.
  • Verify encapsulation with calcium-corrosion or equivalent water-vapour transmission measurements, and ask whether ALD layers are in the qualified stack or only in a pilot.
  • Re-check the drive architecture: refresh range, low-frame-rate flicker, pixel circuit (7T1C or 8T1C) and driver-IC timing, since a backplane change ripples into the timing-controller choice.
  • Model brightness and lifetime together: higher per-pixel emission efficiency is the claimed win, but confirm luminance decay at your own target average picture level, not at a lab test pattern.
  • For purchasing: reserve capacity in writing (the 8.6-generation ramp is still absorbing fixed cost, which suppliers have flagged as margin pressure), and require milestone-based re-forecast clauses instead of roadmap dates.

Common pitfalls

  1. Reading "sputtering" as a replacement for emissive-layer evaporation. It is not; the emitter is still masked-evaporated or patterned by other routes. The dispute here is about the backplane.
  2. Assuming HMO automatically equals a brighter screen. Mobility buys you aperture ratio, uniformity and compensation margin; peak brightness is still set by the emitter materials and the thermal budget.
  3. Assuming ALD means "next generation". Most often it is already inside the encapsulation you are buying today.
  4. Treating development status as production status. Mass-production timing for this process has not been disclosed, and neither has the first product.
  5. Single-sourcing a new backplane. The historical pattern for Apple display technology is dual development across the two suppliers, so your qualification plan should mirror that.

Action plan: the next 90 days

  1. Weeks 1 to 2: pull your current OLED backplane assumptions into a one-page matrix (mobility, refresh architecture, encapsulation, driver IC) so you can see what an oxide switch touches.
  2. Weeks 3 to 6: request sample-level data packages from both panel makers using the checklist above, and flag any answer that mixes development and mass-production vocabulary.
  3. Weeks 7 to 10: run a reliability simulation on the worst-case brightness and thermal scenario, and confirm whether your luminance target is met by efficiency gains or simply by pushing more current.
  4. Weeks 11 to 13: lock a dual-source qualification plan with capacity reservations and milestone clauses, and set a decision gate aligned to a real product build rather than to an announced technology demo.

FAQ

Is the new process already shipping?

No. Apple is examining a sputtering-based route for HMO panels, and both Samsung Display and LG Display are developing ALD plus related sputtering for future lines. Volume timing is undisclosed.

Which products benefit first?

Apple's stated direction is broader OLED adoption across its devices, with iPhone and iPad named as the beneficiaries of higher brightness and better display quality. Which model goes first is not public.

Will LTPO be replaced?

HMO is positioned as an upgrade path for low-power backplanes and is widely discussed as an LTPO alternative. In practice LTPO will keep shipping while oxide mobility, uniformity and reliability are qualified, so expect mixed backplanes across product tiers for several generations.

Why does oxide matter for battery life?

Oxide transistors keep very low off-state leakage, which is what allows long refresh intervals. Raising mobility from below 10 cm2/Vs toward the 30 to 50 cm2/Vs band removes the traditional reason for pairing oxide with polysilicon, and with it some of the process cost.

Should a hardware buyer change supplier now?

No — but you should change your questions. Ask for layer-level process detail, mobility distribution data, stress-test results and encapsulation measurements, and price the risk of a backplane transition into your next contract cycle.

Bottom line

The interesting part of this story is not that Apple wants a brighter screen. It is that a change in one thin-film deposition step inside two array fabs will reset who owns the cost curve for the next generation of OLED. For engineers and procurement teams, the lever available today is evidence rather than optimism: mobility spread, bias-stress drift, barrier performance and capacity commitments. Those are the items that turn an HMO headline into a panel you can actually put in a product.

Prepared by Rachel Williams, Electronics & Engineering. For corrections, supplier data or technical contributions, contact info@electronicseng.com.

Sources consulted: EE Focus report on LG Display's HMO backplane programme (eefocus.com); Sigmaintell commentary on mask-free OLED timing (zhihu.com); UBI Research shipment figures via Sina Finance (finance.sina.cn); 8.6-generation ramp reporting (ithome.com, statementdog.com, nb.zol.com.cn); thin-film encapsulation deposition-rate comparison in patent CN107123753A (patents.google.com); OLED encapsulation water-vapour transmission requirements (researching.cn).

Brand logo

Grand Metropolitan Hotel

Industry Media for Semiconductors & Electronic Engineering

SemiconductorsEmbedded SystemsPCB DesignPower DevicesEDA ToolsGeneralAPAC TechDigit

© 2026 Electronics & Engineering.

Cookie Notice

We use cookies to improve your experience and analyze website traffic. Read our Privacy Policy to learn more.