Integrated Optics, Step by Step: An Engineering Playbook for Celestica and Broadcom Co-Packaged Optics After the OCP Global Summit

Co-packaged optics only pays for itself when switch silicon, optical engines, board assembly, cooling and laser supply are validated as one system. That is the practical takeaway from the Celestica and Broadcom conversation with EE Times at the Open Compute Project (OCP) Global Summit. What follows is an engineer-facing playbook: how the power and latency gain is created, which party owns which risk, and the checks to run before CPO enters your build list.

AI, machine-learning and HPC training jobs keep raising two curves at once — bandwidth per accelerator and joules per bit moved between nodes. Copper traces and pluggable optical transceivers are approaching their scaling limits, which is why the industry is pushing the optical interface inward, onto the semiconductor package itself. Moving that boundary shortens the electrical channel, trims latency and thermal overhead, and keeps signal integrity intact at 200G-class lanes. The trade is maintainability: an optic that lives inside a package is far harder to swap than one that lives on a faceplate.

What actually changed at the OCP Summit?

Short answer: integrated optics crossed from paper architecture to a shippable, rack-shaped product that a system integrator can build at volume. Speaking to EE Times at the OCP Summit, Tareq Bustami, vice president of market technology at Celestica, and Manish Mehta, vice president of marketing and operations at Broadcom, described a strategic partnership aimed squarely at accelerating adoption of integrated optics for next-generation data center infrastructure — not as a lab demo, but as a manufacturable platform.

The summit window in San Jose (October 12–15) underlined that shift. Celestica introduced the DS6005, a 102.4 Tbps, 1.5OU, fully liquid-cooled, 64-port 1.6TbE co-packaged optics switch dimensioned for Open Rack Version 3 deployments, and the platform is built on Broadcom Tomahawk 6 – Davisson — the industry’s first 102.4-Tbps Ethernet switch with co-packaged optics and the third generation of Broadcom’s CPO line. For a design team, the existence of a named, dimensioned SKU is the signal that matters more than any slide on energy per bit.

Four themes carried through the interview, restated here as engineering questions:

  • Where integrated optics delivers measurable technical and operational benefit in modern AI and HPC data centers.
  • How Celestica’s advanced manufacturing, integration and design capabilities carry Broadcom’s silicon photonics and networking innovation into a shipping system.
  • Which OCP Global Summit takeaways govern deployment — open standards, thermal management, and the scaling path to commercial volumes.
  • What the roadmap for optical interconnects and energy-efficient data center architecture looks like beyond the current generation.

Why does putting the optic on the package cut power and latency?

The saving is not created by a more efficient laser. It is created by deleting copper. In a pluggable design, a differential electrical channel runs from the switch ASIC through the connector to the module, where a DSP retimes and equalises the signal before it ever reaches the photonics. At 200G-per-lane PAM4 rates, that channel and its retiming stages consume a large share of the link budget.

  • Power: SemiAnalysis, in its Co-Packaged Optics market and technology book, models a full transition to CPO as cutting transceiver power by roughly 84% relative to DSP-based pluggables, with part of the benefit recaptured by more efficient host SerDes.
  • Latency: removing DSP and retimer stages saves tens of nanoseconds per hop. Treat that as industry analysis rather than a vendor-guaranteed figure, but note how it compounds: a multi-tier fabric with several hops per collective step turns per-hop latency into job-level time.
  • Link stability: Broadcom positions Davisson around power efficiency plus link stability at 102.4 Tbps, on the argument that shorter electrical runs are cleaner electrical runs. Reporting on the platform from Stordis cites roughly a 70% reduction in optical interconnect power (about 3.5× versus pluggable) and, for the prior generation, one million cumulative 400G CPO port-device hours with zero link flaps.
  • Thermal location: the heat does not disappear; it relocates from the faceplate into the package and the rack loop, which is exactly why the DS6005 is liquid-cooled rather than air-cooled.

Pluggable, near-package or co-packaged: how the options compare

Decision dimensionPluggable DSP opticsNear-package optics (NPO)Co-packaged optics (CPO)
Where O/E conversion happensAt the faceplate, behind the full electrical channelBeside the ASIC, on the same board or substrateInside the switch ASIC package
Electrical channel at 200G/laneLong; needs DSP equalisation and retimingShortened; retiming often retainedShortest; retiming largely eliminated
Power per bitHighest — the baseline everyone cites savings againstModerate improvementLargest improvement (up to ~84% transceiver power, per SemiAnalysis modelling)
Latency per hopDSP processing adds nanosecondsReducedLowest, since DSP/retimer stages drop out
Field-replaceable unitThe transceiver; swap in minutes, no toolsOptical subassembly, board-level reworkExternal laser module only; engine and fiber attach are factory scope
Second-source leverageHigh, multi-vendor and multi-form-factorMediumLow; tied to the switch and integrator stack
Infrastructure demandAir cooling, standard depthImproved airflow or hybridLiquid cooling, 48 V power, ORv3 rack tolerances
Best fit todayBrownfield fabrics, campus and aggregation layersBridge designs and vendor-light roadmapsNew build, liquid-cooled AI fabrics at 1.6TbE per port

How do Celestica and Broadcom split the work?

The split answers the maintainability objection by dividing it. Broadcom owns the photonic and switching silicon: switch ASIC, silicon photonics, optical engine design and the SerDes behaviour that makes CPO power claims credible. Celestica owns the part that actually breaks in the field — integration: substrate and board design, fiber attach, assembly yield, system-level test, cooling hardware and rack integration.

  • Silicon side (Broadcom): generational CPO continuity matters to buyers. A third-generation platform implies accumulated learning on engine attach, coupling drift and burn-in, not a first-pass design.
  • Integration side (Celestica): co-designing 102.4 Tbps into a 1.5OU chassis means 48 V busbar power delivery, blind-mate liquid manifolds, and standardized dry-run procedures before the part ships. This is where open standards from the OCP ecosystem stop being documents and become mechanical tolerances.
  • Test side (joint): optical engines are effectively un-reworkable once attached, so screening of PIC and EIC, active alignment of fiber array units, and electro-optical combined test move upstream into manufacturing. Siemens’ semiconductor packaging blog notes that CPO demands a transformation in manufacturing and test, with optical attach methods and test standards still evolving.

Read that division as a procurement instruction: the vendor that supplies the ASIC is not the vendor that owns your yield, your rework policy or your rack integration risk.

Which steps should a CPO evaluation follow?

  1. Model bandwidth and energy per accelerator, not per port. Compute aggregate north-south and scale-out traffic per XPU and the corresponding pJ/bit today. If a pluggable-based design already fits your power envelope per rack, CPO buys headroom rather than solving a blocker.
  2. Set an explicit gate. Define the minimum power or latency delta that justifies losing faceplate-level replaceability, and write it into the design brief before talking to vendors.
  3. Prove rack readiness first. Confirm ORv3 dimensions and depth, 48 V busbar capacity, coolant supply temperature and flow, blind-mate manifold availability, and service clearances. A 1.5OU liquid-cooled switch in an air-cooled, 12 V rack is not a deployment, it is a rework project.
  4. Design the fiber plant as a system. External launch optics change cabling: shuffle length, MPO/FAU routing, bend radius, connector cleaning intervals and strain relief all need a drawing before the switch arrives. Our six-gate packaging playbook for semiconductor teams scaling AI optics maps where yield is typically lost.
  5. Fix the FRU boundary in writing. Ask what is field-replaceable: external laser source only, laser plus fiber shuffle, or the whole board. OIF’s work on pluggable external laser modules exists precisely because the laser is the most failure-prone element; APNIC’s CPO deep dive makes the same reliability argument.
  6. Validate supply, not just specs. Test laser, PIC and optical-engine lead times, plus the integrator’s capacity for active alignment and electro-optical test — that capacity, not the switch die, often sets your delivery curve. This is the second-source question we unpack in our read on what the $115 billion Marvell-Lumentum deal changes for AI datacenters.

What belongs on the validation and procurement checklist?

Reliability evidence

  • Cumulative port-device hours and link-flap counts from the same silicon generation and modulation scheme, not the predecessor family.
  • Laser wavelength and power drift curves over temperature, with the alarm thresholds exposed to your telemetry.
  • BER floors per lane at end-of-life temperature, plus the retuning policy when drift begins.

Operational readiness

  • Laser safety classification and handling procedure, cleaning protocol, and a documented no-hot-swap rule for the optical engine.
  • Spare strategy for external laser modules expressed as a stocking ratio, with a defined time-to-recover target.
  • Firmware and SerDes tuning ownership: who signs off on equalisation changes after deployment.
  • RMA scope defined in words: which assemblies travel back to the factory, and how long your rack runs degraded meanwhile.

Commercial and risk terms

  • Warranty boundary between switch silicon and co-packaged optics — the highest-value item and the least serviceable one sit in one package.
  • Multi-year support commitment and a clause on optical-engine supply continuity.
  • TCO modelled at rack level (power, cooling, spares, downtime), not at port level.
  • A written fallback: pluggable or copper-based design that still meets the roadmap if CPO volumes slip.

Five common misconceptions about integrated optics

  • “CPO saves power automatically.” The saving is real but conditional: it requires liquid cooling and a host design that actually retires the retiming stages. Otherwise you inherit the thermal load without the electrical credit.
  • “An external laser makes CPO as serviceable as a pluggable.” It makes the most failure-prone element replaceable. The optical engine and fiber attach stay factory scope, so mean-time-to-repair for a non-laser failure is a different order of magnitude.
  • “Pluggable optics are finished.” The transition is real, but pluggable and copper links remain the default where they still meet the power budget, and form factors continue to evolve upward in per-lane rate.
  • “The switch ASIC is the long-lead item.” Frequently the binding constraint is laser supply, fiber-array assembly capacity and multi-site optical test throughput.
  • “Vendor reliability data transfers to my fabric.” Zero-flap numbers from one generation, topology and traffic model do not generalise; demand data matched to your deployment class.

What does the market data say about timing?

Two figures frame the risk of waiting. Yole Group’s Co-Packaged Optics for Data Centers 2026 report, as presented in its August 2026 press release, forecasts CPO optical-engine revenue rising from about $0.6 billion in 2026 toward $112.1 billion in 2031; the same firm’s earlier CPO assessment put the photonics packaging content for CPO approaching $5 billion by 2031. The direction is unambiguous and the ramp is steep, which means two things for engineering managers: qualification capacity at OSATs and integrators will tighten, and design-in decisions taken in 2026–2027 will shape fabrics that run past 2031. Treat integrated optics as a packaging and supply-chain program, not as an optics swap.

Frequently asked questions

Is co-packaged optics the same as integrated optics?

In practice, integrated optics is the umbrella term used at the OCP Global Summit for putting optical interfaces onto or into the semiconductor package; co-packaged optics is the specific architecture where the optical engine shares the ASIC package. Near-package optics is the intermediate step on the same board.

How much power should I actually budget as saved?

Published modelling spans a wide band: up to about 84% transceiver-power reduction versus DSP pluggables in SemiAnalysis’s full-transition scenario, and around 70% (roughly 3.5×) for Broadcom’s Davisson-class links. Use the conservative end in the business case, because rack-level cooling and test cost partially offset the link saving.

Do I need liquid cooling to deploy CPO?

For shipping examples, yes. The Celestica DS6005 is a fully liquid-cooled 1.5OU platform sized for ORv3 racks. If your hall cannot deliver coolant supply temperature and flow, the decision is a facility project before it is a network project.

What happens when an optic fails?

The replaceable element is normally the external laser module. An optical-engine or fiber-attach failure means board or assembly-level recovery, so your spares pool, warranty terms and degraded-mode runbook must be defined at design time, not after the first incident.

Should a mid-size enterprise wait for the second CPO generation?

If you are building air-cooled, pluggable-based fabrics with headroom, waiting costs little. If your roadmap hits per-rack power walls within 24 months, qualify the current generation now, because qualification and rack preparation, not silicon availability, will dominate your timeline.

Action recommendations

  • Silicon and board design teams: publish an internal CPO gate (pJ/bit and per-hop latency thresholds) and start fiber-attach and test-capacity conversations now, since those steps precede first article.
  • Hardware procurement and supply chain: dual-source the serviceable layer — external lasers, shuffles, MPO infrastructure — even where the switch stack itself cannot be second-sourced.
  • Data center operations: treat 48 V distribution and blind-mate liquid manifolds as prerequisite milestones with owners and dates; standardize dry-run and cleaning procedures before the switch lands.
  • Technical management: tie the CPO decision to open-standards participation. Thermal envelopes, rack form factors and telemetry models agreed in the OCP ecosystem are what keep a multi-rack fabric portable across vendors.

Sources referenced

  • Celestica DS6005 announcement, corporate.celestica.com
  • Broadcom Tomahawk 6 – Davisson 102.4-Tbps CPO switch release, broadcom.com
  • Broadcom 2026 OCP Global Summit preview (October 12–15, San Jose), investors.broadcom.com
  • EE Times partner interview with Celestica and Broadcom at the OCP Summit, eetimes.com
  • SemiAnalysis, Co-Packaged Optics book, newsletter.semianalysis.com
  • Stordis, Broadcom Tomahawk 6 vs TH6-Davisson: Key Differences, stordis.com
  • Yole Group press release on photonics and AI, yolegroup.com
  • APNIC blog, Co-Packaged Optics — a deep dive, blog.apnic.net
  • Siemens blogs, Five Key Trends of Co-Packaged Optics (CPO) in 2026, blogs.sw.siemens.com

Related reading

  • Electronicseng Semiconductors Desk: Reading SEMICON Europa 2026 (Munich, Germany, November 10-13) as an Engineering Briefing on Advanced Packaging, APC and Fab Automation
Brand logo

Grand Metropolitan Hotel

Industry Media for Semiconductors & Electronic Engineering

SemiconductorsEmbedded SystemsPCB DesignPower DevicesEDA ToolsGeneralAPAC TechDigit

© 2026 Electronics & Engineering.

Cookie Notice

We use cookies to improve your experience and analyze website traffic. Read our Privacy Policy to learn more.