For stacked-die semiconductor programs, the practical constraint is moving electrical, power, thermal and package data through a single design space before late signoff. A recent update connects the agentic AI capabilities introduced at DAC 2026 with NVIDIA accelerated computing, so teams can evaluate 3D IC electrothermal behavior across seven EDA tools and test hundreds of design points per cycle.
AI accelerators demand higher compute capacity, wider memory bandwidth and tighter thermal control inside compact packages. The NVIDIA Rubin GPU, for example, supports up to 50 petaflops of NVFP4 inference and up to 288 GB of HBM4 per GPU; those GPUs can be combined into systems such as NVIDIA Vera Rubin NVL72. As compute and memory move closer together, power density and heat concentration increase. The implication for 3D IC development is that electrothermal co-design belongs in design loops, not only in final verification.
At the center of the release is a coordination layer that aligns Siemens electrothermal analysis tools through one workflow. The Siemens Design Space Exploration and Optimization (DSE/DSO) technology lets engineers test and validate alternatives with physics-based signoff solvers. The benchmark data cited here comes from Siemens reported studies: up to a 95% reduction in engineering effort, up to a 99% reduction in workflow setup time, and up to 50 times greater design exploration coverage compared with manual workflows.
| Workflow aspect | Manual coordination pattern | Agentic coordination pattern |
|---|---|---|
| Tool coordination | Specialists coordinate multiple tools and transfer data across electrical, power, thermal and extraction analyses. | A coordination layer aligns Siemens electrothermal analysis tools through one workflow; the Fuse EDA AI Agent, integrated with Intelligence Center X, coordinates multiple Siemens tools. |
| Evaluation pattern | Teams may reduce the number of scenarios evaluated under time and computing constraints. | The agent runs coupled electrothermal analyses, guides design-space exploration, assesses trade-offs and reruns selected configurations against objectives. |
| Issue discovery | Power and thermal issues can be identified later. | It helps engineers evaluate additional alternatives and identify power and thermal issues earlier in development. |
| Scale | Manual effort is the comparison baseline. | Using seven EDA tools, the workflow coordinates electrothermal analysis and evaluates hundreds of design points per cycle. |
The engineer defines design objectives. The Fuse EDA AI Agent, integrated with Intelligence Center X, coordinates multiple Siemens tools. It runs coupled electrothermal analyses, finds unmet targets, and evaluates whether causes involve power delivery, placement, materials or a combination of factors. Based on the results, it guides design-space exploration, assesses trade-offs and reruns selected configurations against the objectives.
The workflow coordinates nine steps across seven Siemens EDA tools. It performs 50 to 100 reasoning steps during an eight- to 10-hour runtime and can evaluate heat transfer coefficient (HTC) boundaries, power budgets and material stack-ups across 200 to more than 500 design points per cycle.
Siemens combines the NVIDIA Agent Toolkit with NVIDIA accelerated computing and CUDA-X libraries to support the agent-driven EDA workflow. Accelerated simulation tools supply analysis results that agents evaluate during design exploration.
It combines agentic AI capabilities introduced at DAC 2026 with NVIDIA accelerated computing to support electrical, power, thermal and co-design analysis for 3D integrated circuits (ICs).
The workflow coordinates nine steps across seven Siemens EDA tools and uses seven EDA tools for electrothermal analysis.
It can evaluate heat transfer coefficient (HTC) boundaries, power budgets and material stack-ups across 200 to more than 500 design points per cycle, and it evaluates hundreds of design points per cycle in the broader workflow description.
The cited example is the NVIDIA Rubin GPU, which supports up to 50 petaflops of NVFP4 inference and up to 288 GB of HBM4 per GPU.