On the bench, the fastest number is usually the one that stops earliest. Publish worst-case re-tune, re-lock and handover latency as a stage table with named start and stop points, a stated statistic and a reference configuration another lab can repeat. A bare worst-case figure behaves like a typical figure in nicer clothing, and buyers will misuse it. Where the control loop already tolerates long gaps, tuning range, sensitivity and power decide the purchase, and re-tune time stays off the front page.
The warning sits in a public test log. With the filter kernel set to 768, WFM audio latency in SDRSharp v2.1637a moved from 117 ms to 342 ms (pgsr.cn). The report traces the shift to a center configuration file: version v2.1637a gathers filter parameters under [Filter] MaxKernelSize, with 1024 as the threshold for the GPU-accelerated FFT path, and 768 forces CPU fallback with unaligned memory access. The same file carries an [Audio] LatencyMs entry that works as a queue-depth threshold. A setting of 50 drops high-frequency signal content, 500 leaves demodulation latency uncontrolled, and the tester settled on 120 as a balance for ADS-B message integrity and voice timing. Those settings live in an ini file and in lab notes, and they appear on no hardware datasheet.
A published analysis of the Xiegu G7250 describes a product page that promotes very fast tuning, while details indicate a new tuning solution may take as long as 10 seconds and a previously stored solution can be recalled in less than one-tenth of a second. Memory recall and fresh search are separate operations; quick recall says nothing about search time for a new match (N1JUR).
Taken together, those cases expose the gap between envelope data and time-domain behavior. Tuning range tells you where a radio can go. It says nothing about trip duration, link behavior during the move, or which software layer learns that the link has gone.
"Software-defined radio enables AI systems to connect with the physical world through programmable wireless links." That description (Electronicseng) covers 5G, 3GPP paths and Vicinity-type deployments, and it stops where timing work begins. Dayaotech describes intelligent driving and V2X networking as placing near-extreme demands on communications, including ultra-low latency across vehicle-to-vehicle, vehicle-to-infrastructure, vehicle-to-pedestrian and vehicle-to-network links (Dayaotech). Fierce Network reports from the operator side that roaming robots, drones and autonomous systems will need low-latency wireless, and that physical AI could be telecom's best AI opportunity (Fierce Network).
Inside such a loop, reconfiguration opens a hole in the control path. For an interval labeled N, the radio sends nothing usable and receives nothing usable, while the controller holds its last output or falls back to a degraded mode. With loop period labeled T, the design question is the relation of N to T. 3GPP Release 15 sets the URLLC target at 1 ms user-plane latency (5G Americas), which gives a concrete yardstick: a retune that consumes a large share of T is a control problem, not a radio spec. A vendor that publishes N and leaves T to the buyer has published a partial result, and a stage table serves integration better than a headline figure on a marketing page.
The discipline transfers from other links. A survey of SDR and optical techniques for inter-satellite links in CEAS Space Journal states that sizing should provision for worst-case coherent DSP and LDPC decoding, and that the radio should expose per-frame quality metrics and decoder iteration counts to inform adaptive coding and modulation decisions (Springer). Plan for the tail, then publish measurements that let the other side of the interface react.
A fresh tune walks through PLL settling and lock detect, filter settling, AGC convergence, digital datapath reconfiguration, buffer drain, then waveform acquisition before the link carries traffic again. The slowest stage sets the headline, and the slowest stage varies with design. PLL lock and filter settling follow hardware and reference clock; waveform acquisition follows protocol state; buffer drain follows host software and load, which makes it the stage most likely to disappear from a quoted figure.
Analog Devices defines PLL lock time as the time to jump from one specified frequency to another within a given frequency tolerance (Analog Devices), and synthesizer data sheets in that class quote typical lock times in the hundreds of microseconds (ADF4106 data sheet). That is orders of magnitude below the 117 to 342 ms host-side latency in the SDRSharp log. The comparison matters because a datasheet that quotes the PLL stage and hides the host stage is quoting the wrong number.
| Stage | Bound by | Typical scale | What the disclosure must state |
|---|---|---|---|
| PLL settling and lock detect | Hardware, reference clock | Hundreds of microseconds typical on synthesizer-class parts | Start at command or register write; stop at lock-detect bit; tolerance band |
| Filter, AGC, datapath reconfiguration | DSP configuration, kernel size | Design dependent; the 768-kernel case moved audio latency from 117 ms to 342 ms | Kernel size, GPU versus CPU path, memory alignment |
| Buffer drain | Host software and load | Millisecond scale when queues run deep | Queue depth, host load, and whether it sits inside the quoted interval |
| Waveform acquisition | Protocol state | Protocol dependent | Stop at a valid decoded frame, not at the lock bit |
Endpoints decide comparability. A figure measured from host command includes driver and scheduling delay. A figure measured from register write starts later. A figure closed at the lock-detect bit stops early. A figure closed at the valid decoded frame runs longer. Field variance comes largely from the host side, so a disclosure has to state start and stop points, plus whether host-side buffer and queue parameters sit inside or outside the quoted interval. Instrument practice already works this way: settling-time measurements are defined against a tolerance band and a trigger point, not against a vague "settled" label (Rohde & Schwarz).
Starlink offers a precedent for tail disclosure from a field where the tail looks uncomfortable. The project reports that worst-case peak-hour latency at p99 fell by over 60%, from over 150 ms to less than 65 ms, alongside median reductions. Outside the United States, median latency fell by up to 25% and worst-case latencies fell by up to 35% (Starlink). The percentile traveled with the figure, along with the population and the measurement point. SDR datasheets should adopt that habit: stated statistic, stated population, stated points.
The strongest objection concerns comparability. Re-tune time shifts with waveform, channel bandwidth, filter settings, interference, temperature, reference clock and software build. Vendors quoting different figures from different start and stop points will mislead a procurement team without a bench, and the smaller figure will read as the better radio. Market scale sharpens the concern. Mordor Intelligence values software-defined radio at USD 16.97 billion in 2025 and USD 18.07 billion in 2026 (Mordor Intelligence). Knowledge Sourcing places 2026 at USD 16.7 billion and projects USD 23.3 billion by 2031 at a 6.9% compound annual growth rate (Knowledge Sourcing). The houses disagree on the 2026 level, which warns that even sizing needs definitions read closely. Any comparison metric at that scale will attract tuning of the metric itself.
The same failure mode is familiar in timing engineering. Static worst-case execution time analysis generally cannot account for every source of interference on a multicore part, which is why multicore timing evidence combines architectural analysis with controlled scenarios and measurements (Rapita Systems), and why certification guidance such as A(M)C 20-193 expects that combined evidence (LDRA). A radio timing figure without its scenario set is the radio-side equivalent of a static-only WCET claim: plausible, and not auditable.
Buyers already compare with poorer inputs: a phrase about fast tuning, or a bench result from a unit at room temperature against a friendly waveform. A published envelope tied to a named reference configuration remains imperfect, but it can be audited, and auditable inputs serve buyers better than unverifiable phrases. Small vendors merit a tiered expectation: publish for a named reference configuration, publish the method in enough detail for a customer to reproduce it, and list conditions left untested. A limited figure with visible gaps helps design work; a confident figure with none does less.
Common mistakes when comparing re-tune figures:
No. Recall returns a stored solution; a fresh search has to find a new match. The Xiegu G7250 analysis separates the two: recall in less than one-tenth of a second, a new solution as long as 10 seconds.
Because the start point, stop point, statistic, temperature range and host configuration are rarely the same. Ask for each of those before ranking.
At minimum: command or register write at the front, lock-detect bit or valid decoded frame at the back, plus a statement of whether host buffer drain sits inside the interval.
Both are legitimate, but they are different numbers. Starlink publishes a p99 peak-hour figure; a vendor that says only "worst case" without a statistic has not published a worst case.
When the control loop tolerates the gap, meaning N is small relative to T, and sensitivity, tuning range and power dominate the purchase. Budget the deadline first, then decide.
Until publication becomes habit, selection documents must pull the data. The register habits carry over: trust the measured path from antenna to decoded bit, write down start and stop conditions, keep host load in the record.
A stage table with a named reference and a stated statistic gives integration a basis for budgeting this year. Tuning range keeps its place; it cannot budget a deadline.
Felix Campbell, embedded systems engineer, Electronics & Engineering · info@electronicseng.com