Brand logo
HomeSemiconductorsEmbedded SystemsPCB DesignPower DevicesEDA ToolsGeneral
  1. Home
  2. /
  3. semiconductors
  4. /
  5. from-carborundum-to-chips-silicon-carbide-next-use-sofia

SiC Design and Sourcing Playbook: Practical Steps for Power Engineers After GSIF 2026

Silicon carbide is no longer a materials gamble; for a design team it is a sourcing and qualification decision. Our short answer: lock your cell architecture and wafer size against real thermal and short-circuit limits, get substrate and fab capacity written down before committing a platform, and identify which customer pays for the volume you intend to build. The playbook below distils what the Electronics & Engineering Semiconductors desk took from the Green Semiconductors Investment Forum, plus the figures assembled afterwards.

Why a 135-year-old accident still sets your risk profile

Conclusion first: SiC keeps changing jobs, so never price a platform against a single application. In 1891, Edward Acheson, once an assistant to Thomas Edison, used an electric arc to heat clay and carbon while trying to produce artificial diamonds. Instead he obtained small, hard, blue-black crystals, which he called carborundum. Two years later, the French chemist Henri Moissan was searching for diamonds in meteorite fragments from Arizona and found the same substance in nature; the mineral was later named moissanite in his honour.

Because it is nearly as hard as diamond, the material first served as an industrial abrasive for most of the 20th century. It then became an early radio detector, the crystal in which electroluminescence was first observed in 1907, a synthetic gemstone in the late 1990s (grown by Cree, the company later renamed Wolfspeed), and ultimately a component in power devices inside electric cars. Last week, at the Green Semiconductors Investment Forum in Sofia, Bulgaria — held under the patronage of the Bulgarian government and the British Embassy — the agenda was the initiative to establish Green Silicon Carbide Manufacturing (GSCM), a SiC fab in the country designed as an integrated device manufacturer, promoted by Bulgarian-born Prof. Asen Asenov. Rachel Williams of our desk sat on the investors' panel, representing the startup ecosystem, and closed her remarks by pointing to that history: more than 130 years later the room full of entrepreneurs and investors was still trying to turn silicon carbide into diamonds.

The engineering consequence is concrete. A recent review by researchers at Singapore's A*STAR Institute of Microelectronics describes SiC as a promising platform for photonic and quantum chips, largely because it can be processed in standard CMOS fabs, although the field is still at an early research stage. Over 135 years the material has been reinvented several times, which means substrate capacity, qualification history and process design kits are all priced for the power market today — not for whatever use wins next.

How large is the demand signal, and which stage does SiC really fill?

Answer: the growth curve is intact, but SiC and GaN occupy different positions in your power chain and are not interchangeable line items. Yole Group's Poshun Chiu, who presented in Sofia, expects wide-bandgap power devices (SiC and GaN together) to pass $14 billion by 2031, growing at around 22% a year. Three drivers stand out.

  • Automotive electrification is shifting to 800V architectures, which use more SiC; Yole expects the share of battery electric vehicles using them to grow from about 12% in 2025 to about half by 2031.
  • Renewables, storage and wind keep growing, and they buy higher-voltage parts than cars do.
  • AI data centers are redesigning their power chain around 800V DC, with SiC moving upstream toward the grid connection (power shelves and, later, solid-state transformers fed at 10 to 20 kV), while GaN takes the stages closer to the processors.

That third driver now has a dated, public anchor. Nvidia has published its 800 VDC architecture for AI factories, targeting 1 MW-class racks and naming power-system and silicon partners in its ecosystem write-up, with first deployments from 2027. Wolfspeed's own application note on SiC-based solid-state transformers maps directly onto the upstream, 10 to 20 kV position shown on the Yole slide. If you build rack-level DC distribution, put that 2027 date into your roadmap review rather than treating AI as a vague upside case. On the stage nearer the load, 900 V GaN bidirectional switches are already being designed into solid-state transformers, which is how the SiC/GaN split announced in Sofia is starting to look in real silicon.

Price reality check: according to TrendForce, Chinese producers have pushed six-inch SiC substrate prices from around $1,500 to $500 or less. Do not read that as a device-level saving. Once the substrate is a small fraction of a qualified MOSFET's cost, further wafer discounting stops flowing into your bill of materials — and the qualification work you paid for stays non-refundable.

What the Wolfspeed file teaches about debt, utilisation and second sourcing

Conclusion: in SiC, capacity built ahead of demand is the primary failure mode, not technology. Wolfspeed, the long-time market leader, filed for Chapter 11 in June 2025, reportedly carrying about $6.7 billion of debt, much of it raised to build new fabs ahead of demand. After re-emerging with 70% less debt, it is clearly recovering, but slowly. In its latest quarter, to September 2026, it still reported a negative gross margin of about 13% (non-GAAP). Management called underutilization the main drag on margins and said that running the new Mohawk Valley fab at around 25 to 30% of capacity would be enough to reach gross-margin breakeven, which suggests it currently runs below that level. It expects to approach gross margin breakeven this quarter, helped by AI data center demand, its fastest-growing market, and in October it secured a conditional $1.5 billion loan commitment from the U.S. Department of War, a sign of how strategic SiC has become.

The case also shows how unforgiving prepayment structures are: despite technology leadership and an anchor customer, Renesas, which prepaid about $2 billion for wafer supply, the company still went bankrupt because it built capacity on debt in a cyclical market while prices fell. Run this six-point due-diligence list against every SiC supplier before you sign a long-term agreement:

  1. Ask for fab utilisation by line, not corporate averages — margin in SiC is an absorption problem.
  2. Ask how expansion was financed and whether the debt is secured on your wafer supply or on general assets.
  3. Ask whether your prepayment buys allocation or only a price discount; allocation without a volume floor is worthless in a downturn.
  4. Require a qualified second source on the same die footprint, or accept a single-supply platform risk in writing.
  5. Ask which government money is in the line, since loan conditions can change allocation and reporting duties.
  6. Re-check your design margin: if the supplier hits breakeven, the price war usually resumes.

Where the $30 billion is going, and why location now beats ownership

Conclusion: European ownership of SiC is strong, European control of SiC geography is not. Yole data show that European companies (ST, Infineon, Bosch, and others) hold roughly half of the global SiC device market. They are much weaker upstream, with only about 10% of the substrate market, and Europe itself is a small market for SiC in cars, around 12% of global demand against about 63% for China.

Yole also showed a map of more than $30 billion in announced SiC investment as of mid-2026. Re-sorted by the headquarters of the investing company rather than by the location of the target investment, about half of the money comes from European companies, but only around 40% of that money is actually being invested in Europe, mostly in ST's campus in Catania. The largest projects of European champions are elsewhere:

CompanyProject locationWhat it signals for sourcing
InfineonKulim, MalaysiaAnchor of Yole's predicted Southeast Asia power SiC hub; back-end ecosystem already local
BoschRoseville, CaliforniaFollows U.S. subsidy and its own vehicle-programme demand, not home geography
X-FABLubbock, TexasThe main open-access option for fabless teams, and it sits outside Europe
STjoint venture with Sanan in ChinaDevice leadership paired with Chinese substrate access
VishayNewport Wafer Fab, WalesBought in 2024 to set up SiC production; the rare U.S.-style exception in Europe

Chinese and Japanese companies, by contrast, invest almost entirely at home, and U.S. companies mostly do. The reasons are understandable and repeatable: companies follow demand, and most SiC car demand is in China; they follow subsidies, and the U.S. CHIPS Act made American sites attractive; and they follow energy prices, which matter a lot for a material whose crystal growth is extremely energy-intensive. Yole goes further, seeing Southeast Asia becoming the next power SiC hub thanks to Malaysia's established back-end ecosystem, lower costs, government support, and geopolitical neutrality. Europe therefore ends up with sovereignty by ownership, but much less sovereignty by location, which is what counts if supply chains break.

Announced SiC investment by company and location: more than $30 billion as of Q2 2026 (Source: Yole Group, presented at GSIF 2026, Sofia)

Why state aid funded the core instead of the periphery

Conclusion: public money follows bankable incumbents, and new entrants pay the difference. The European Commission's presentation in Sofia listed 19 first-of-a-kind production projects approved for state aid under the Chips Act since 2023, worth more than €34 billion in total. Eleven of them are in Germany, and most of the rest are in Italy, France, and Austria, while almost none is in Europe's peripheral countries. The single exception on the list was onsemi's SiC expansion in Rožnov, Czech Republic. However, just three days after the forum, onsemi and the Czech government announced that it will not go ahead, citing changes in the SiC market and in the project's economics.

First-of-a-kind production facilities approved for state aid under the EU Chips Act since 2023 (Source: European Commission, presented at GSIF 2026, Sofia)

The same slide noted that before the Act, state aid for fabs was limited to assisted regions, so the old rule was a relative advantage for places like Bulgaria; opening aid to the wealthier core moved the money there. The European Investment Bank describes its own role consistently: as EE Times reported earlier this year, the EIB is a lender that screens for cash flow, debt capacity, and execution risk, and strategic importance comes on top of bankability, never instead of it. Chips Act 2.0 is the obvious place to revisit that balance, and it is the tension we traced in Europe's 2026 semiconductor perfect storm. For procurement teams the practical point is simple: a subsidy map is not a capacity map, and projects can be withdrawn on a market signal, as Rožnov just was.

Can you design SiC without owning a fab?

Conclusion: possible today only through a short list of partners, which is why fabless SiC remains a niche rather than a business model. For silicon, design and manufacturing have been separated for decades, with Nvidia and TSMC as the best-known example of how this relationship works. In SiC, almost all of the business, maybe even 90%, sits inside integrated device manufacturers, because the process largely is the product: device performance and reliability depend on process details that are hard to separate from the design. As far as we know, neither TSMC, GlobalFoundries, nor Tower offers SiC. The main open options are:

  • X-FAB in Lubbock
  • a few Taiwanese players announcing 8-inch SiC lines
  • research lines such as Fraunhofer IISB
  • Clas-SiC, the boutique SiC foundry in Scotland, which recently announced a £12 million (~$16 million) expansion

Jen Walls, CEO of Clas-SiC, made the point that matters most in her talk: capital can buy the cleanroom, the tools, and the wafers, but it cannot buy the learning curve of yield, reliability history, and customer qualification, which builds up batch after batch. Yole's map of the European supply chain says the same thing visually: strong IDMs, very few foundries, few packaging and power module players, and little direct engagement from end-system makers.

The power SiC and GaN supply chain in Europe (Source: Yole Group, presented at GSIF 2026, Sofia)

If open SiC capacity existed, startups would be its first users: niche high-voltage devices, radiation-hardened parts for space, and sensors for harsh environments, with an independent layer of gate drivers, power modules, test, reliability and design kits growing around them, as happened in silicon. System companies already behave as if they own the stack: Tesla designs its own SiC power modules and buys the chips, and in 2023 it announced it would cut its SiC use by 75% through design changes (CNBC). If a hyperscaler or a carmaker eventually decides to design its own SiC devices, they will look for a neutral foundry rather than an IDM that competes with them. Design accordingly: your device is replaceable, your qualification data is not.

Which cell, wafer and vendor should you actually specify?

Conclusion: choose the cell structure for your fault conditions, and the wafer size for your cost curve, not for the marketing deck. Infineon's CoolSiC trench documentation argues that the trench structure shows commonly higher channel conductivity due to fewer channel defects than a planar gate, and peer-reviewed comparisons of commercial parts (Griffith University, 2022) record roughly 105 mΩ trench devices against about 280 mΩ for planar parts in the same class. That headline number is where most design mistakes start.

CriterionPlanar SiC MOSFETTrench SiC MOSFET
Specific RDS(on) at 25 °CHigher; rises steeply as cell density increasesLower, typically the reason designers switch
Behaviour at rated junction temperatureAdvantage gap narrows — always compare at Tj(max), not 25 °C (Electronicseng analysis)Channel mobility derating erodes the room-temperature win
Robustness and FBSOAHistorically forgiving; easier to defend in short-circuit specVerify UIS/short-circuit ratings per datasheet, lot by lot
Gate-oxide riskLower field stress in the channelAsk for the supplier's gate-oxide screening and burn-in flow

On wafer size, industry analysis of the transition from six-inch (150 mm) to 8-inch (200 mm) SiC puts the targeted die-cost reduction at 30-40% (PatSnap compound-semiconductor technology landscape, 2026). The catch, documented in cost reviews of earlier SiC wafer transitions, is that the first years of a new size can be more expensive per die, because wafer flatness, epitaxy uniformity and defect density all reset at once. So before you accept an 8-inch price narrative, ask for micropipe and baseline defect density by lot, bow and warp data, and a yield curve from the line that will actually ship you parts.

Five misconceptions to drop before your next SiC design review

  • "Substrate prices fell, so my BOM fell." Substrate share of a qualified device cost is small; qualification and redesign are not.
  • "Any pin-compatible part is a second source." Avalanche energy, short-circuit time and gate-oxide distributions differ device by device.
  • "Foundry capacity is available on request." With maybe even 90% of the business inside IDMs and no SiC offer from TSMC, GlobalFoundries or Tower, lead time is negotiated, not bought.
  • "Europe owns SiC, so Europe is safe." Roughly half of devices, about 10% of substrates, and location decisions made in Malaysia, California and Texas.
  • "AI data centers are spare demand." They compete with your automotive allocation for the same 800V DC and higher-voltage capacity.

What an emerging location can contribute to your supply plan

Conclusion: new regions are worth watching for engineering depth, not for cheap wafers. Bulgaria starts from a better place than expected: GlobalFoundries has a fairly large Sofia team, primarily of PDK engineers; Belgium's Melexis has around 700 employees in Sofia; and Milara, a Bulgarian-American company with engineering and manufacturing in Plovdiv, builds wafer-handling robots that go into semiconductor equipment worldwide. The planned GSCM fab has assembled partners that include Clas-SiC for the SiC technology license, Synopsys and SemiWise for PDK development, and Milara for process automation. Prof. Asen Asenov has spent the past three decades at the University of Glasgow, which is where the academic pull for the project comes from.

Three conditions would make such a project investable, and they double as an evaluation rubric for any new SiC site:

  1. Phasing: building capacity in steps as customers sign, as Infineon is doing in Villach, rather than all at once.
  2. Securing a customer base beyond European cars, which are a small market, toward wind, grid, storage, and data center power, where higher-voltage devices face less of the price war.
  3. Leaving the door open to fabless companies' innovations, since a second-source fab earns its keep when allocation tightens elsewhere.

FAQ: what engineers ask before committing to SiC

Is SiC cheaper than silicon IGBT today?

Not at the component level, and the gap is narrowing only where 8-inch lines reach volume. The saving you can defend in a business case is system-level: smaller magnetics, higher efficiency at 800V, and less copper in the DC bus.

Should I design my next inverter on 1200 V or on higher-voltage parts?

If your volume is automotive, assume the price war continues. If you can address grid, storage, wind or rack-level 800V DC conversion, you are buying into the segment with the least direct competition.

How long does an SiC device qualification take?

There is no shortcut: reliability history and customer qualification accumulate batch after batch, which is precisely why Jen Walls argues that capital cannot buy the learning curve.

What is the biggest single risk in the SiC supply chain?

Underutilised, debt-funded capacity combined with concentrated substrate supply — the mechanism that took the former market leader into Chapter 11 in June 2025 despite an anchor customer and technology leadership.

Your 90-day action plan

  1. Week 1-2: audit every SiC part number for single-source exposure and record fab location, wafer size and cell type per part.
  2. Week 3-4: request utilisation, financing and government-funding disclosures from each supplier; rerun the due-diligence list above.
  3. Week 5-8: benchmark your worst-case thermal and short-circuit condition at Tj(max) across planar and trench candidates.
  4. Week 9-10: open a qualification slot with one open-access option (X-FAB Lubbock, an announced 8-inch Taiwanese line, Fraunhofer IISB or Clas-SiC) so you hold a route outside the IDMs.
  5. Week 11-12: name the paying customer for each SiC platform you keep, and kill the ones with no owner.

Before anything else, know which customer is going to pay for the technology you are developing — the advice our desk gave startups on the panel, and the same logic that applies to fabs and regions. Silicon carbide has surprised us several times over 135 years, and its next uses may surprise us again; research for that reinvention should continue in parallel and, if possible, separately from a fab business plan. Acheson never made his diamond. The material he found instead turned out to be worth much more, but more than a century and several false starts were needed to find out how. Written by Rachel Williams, Electronics & Engineering — Semiconductors desk (info@electronicseng.com).

Reference sources

  • Yole Group figures presented by Poshun Chiu at GSIF 2026, Sofia (wide-bandgap market to $14 billion by 2031; announced SiC investment map).
  • TrendForce, six-inch SiC substrate price movement.
  • Nvidia, 800 VDC architecture for AI factories — https://www.nvidia.com/en-us/data-center/technologies/800-vdc-architecture/
  • Wolfspeed, "Powering AI with reliable silicon carbide-based solid-state transformers" — https://www.wolfspeed.com/knowledge-center/article/powering-ai-with-reliable-silicon-carbide-based-solid-state-transformers/
  • Infineon, CoolSiC trench MOSFET technical article — https://www.infineon.com/assets/row/public/documents/24/54/infineon-coolsic-trench-mosfet-combining-sic-performance-with-silicon-ruggedness-article-en.pdf
  • Chaturvedi et al., comparison of commercial planar and trench SiC MOSFETs, Griffith University repository (2022) — https://research-repository.griffith.edu.au/server/api/core/bitstreams/40e322b3-8d1c-443f-8f88-235014dffe0e/content
  • PatSnap, SiC power device technology landscape 2026 (8-inch transition cost-per-die targets) — https://www.patsnap.com/resources/blog/articles/sic-power-device-technology-landscape-2026/
  • PGC Consultancy, "Taking Stock of SiC" cost-competitiveness review — https://www.pgcconsultancy.com/post/taking-stock-of-sic-part-1-a-review-of-sic-cost-competitiveness-and-a-roadmap-to-lower-costs
  • European Commission, first-of-a-kind production projects approved for state aid, presented at GSIF 2026.
Brand logo

Grand Metropolitan Hotel

Industry Media for Semiconductors & Electronic Engineering

SemiconductorsEmbedded SystemsPCB DesignPower DevicesEDA ToolsGeneralAPAC TechDigit

© 2026 Electronics & Engineering.

Cookie Notice

We use cookies to improve your experience and analyze website traffic. Read our Privacy Policy to learn more.